About CHC

CEC

Delhi Metro Railway Project Contract (CC04)

This project for Phase-III of Delhi Metro Rail Corporation Ltd. is scheduled for completion in 2015. It includes design and construction of one underground station at Azadpur linked by 2.145 km twin bored tunnels with internal finished dia of 5.8 m which are engineered through the use of two shield TBMs for the Mukundpur – Yamuna Vihar corridor of the Delhi MRTS. The project also involves Cut & Cover of 690 m and an underground ramp of 365 m at Mukundpur and Shalimarbagh. This project is a joint venture between CEC and its 100% subsidiary (CEC Int’l Corp. India (CICI) with CEC as a lead member. The total contract value of CC-04 is INR 4.168 billion.